Sample report — read only. Every business and figure is made up.
Every order line — Town of Ridgeview (sample)
Dec 1, 2025 – Nov 9, 2026 · supplier Stoughton Building Centre · Show all lines
- Lines22 orders
- Spend before tax$1,377.61
- Counted as local$1,377.61100% of spend
- Indigenous-owned (certified)$0.00
| Order date | Purchase order | Supplier | Badge on order date | Category | Item | Line spend | Local share | Counted as local |
|---|---|---|---|---|---|---|---|---|
| 2025-12-09 | RV-PO-2025-0045 line 1 | Stoughton Building Centre Stoughton S0G |
Verified Local that day | Lumber and building supplies | OSB sheathing, 3/4 in tongue and groove, 4 x 8 ft 13 × $37.99 · SBC-OSB-0023 |
$493.87 | 100% | $493.87 |
| 2026-01-02 | RV-PO-2026-0049 line 1 | Stoughton Building Centre Stoughton S0G |
Verified Local that day | Lumber and building supplies | Plywood, spruce sheathing, 3/8 in, 4 x 8 ft 26 × $33.99 · SBC-PLY-0053 |
$883.74 | 100% | $883.74 |
“Local share” is the part of the line made or supplied locally (for example, 60% when parts are imported). Only that part counts, and only when the supplier was Verified Local on the order date.