Sample report — read only. Every business and figure is made up.
Every order line — Town of Ridgeview (sample)
Jan 1 – Nov 9, 2026 · supplier Lampman Steel & Fabrication, counted as local only · Show all lines
- Lines21 orders
- Spend before tax$2,511.87
- Counted as local$2,511.87100% of spend
- Indigenous-owned (certified)$0.00
| Order date | Purchase order | Supplier | Badge on order date | Category | Item | Line spend | Local share | Counted as local |
|---|---|---|---|---|---|---|---|---|
| 2026-07-16 | RV-PO-2026-0092 line 1 | Lampman Steel & Fabrication Lampman S0C |
Verified Local that day | Welding and fabrication | Gas cylinder exchange, acetylene, size 300 3 × $213.99 · LSF-GAS-0065 |
$641.97 | 100% | $641.97 |
| 2026-07-16 | RV-PO-2026-0092 line 2 | Lampman Steel & Fabrication Lampman S0C |
Verified Local that day | Welding and fabrication | Gas cylinder exchange, oxygen, size 300 10 × $186.99 · LSF-GAS-0032 |
$1,869.90 | 100% | $1,869.90 |
“Local share” is the part of the line made or supplied locally (for example, 60% when parts are imported). Only that part counts, and only when the supplier was Verified Local on the order date.